
The episode discusses the challenges facing the US grid due to rising electricity demand from data centers and the implications for energy infrastructure and market dynamics.
Energy bills are rising, data centers are multiplying, and the grid is straining to keep up. What happens next? For two decades, electricity prices in the United States barely moved. Demand was flat, natural gas was cheap, and the system was largely stable. That era is over. A surge in data center construction, accelerating electrification, and the legacy of years of underinvestment in energy infrastructure have collided to create a system under strain. Nowhere is that more visible than in PJM, the largest wholesale power market in the US, stretching from Illinois to North Carolina, and home to some of the world's most active hot spots for data center development. Host Ed Crooks is joined by Paul Segal, CEO of LS Power, and Melissa Lott, Partner for Energy Technologies at Microsoft, to assess how the system can meet the new challenges it faces. LS Power is a leading developer and operator of electricity generation and transmission, so Paul is right at the heart of these questions. He is making multi-billion dollar decisions that shape the ways that America’s electricity gets supplied. He makes the case that…
Explore listener stats, chart rankings, contacts and more on the Energy Gang podcast page.