Storm Exploration Begins Field Work on 5km Volcanogenic Massive Sulphide Target at Gold Standard

Storm Exploration Begins Field Work on 5km Volcanogenic Massive Sulphide Target at Gold Standard

From Mining Stock Daily by Trevor Hall

June 10, 2026 · 18 min

About this episode

Storm Exploration begins field work on its Gold Standard Project focusing on a volcanogenic massive sulphide target.

Storm Exploration has commenced exploration work on its 100% owned Gold Standard Project located 60km north of Fort Frances in Northwestern Ontario, Canada. President and CEO Bruce Counts told Mining Stock Daily that the exploration program will focus on the extensive volcanogenic massive sulphide target recently identified on the property. The two-phase program begins with ground geophysics, soil sampling and geological mapping over the 5-kilometre-long conductivity anomaly, followed by up to 3,000 metres of drilling expected to begin in July.

People in this episode

Host: Trevor Hall

Guest: Bruce Counts

Topics covered

  • exploration
  • volcanogenic massive sulphide
  • geophysics
  • soil sampling
  • drilling

Keywords

  • Storm Exploration
  • Gold Standard Project
  • volcanogenic massive sulphide
  • geophysics
  • soil sampling
  • drilling

Mentioned in this episode

Organizations: Storm Exploration

Places: Gold Standard Project, Fort Frances, Northwestern Ontario

More episodes of Mining Stock Daily

Explore listener stats, chart rankings, contacts and more on the Mining Stock Daily podcast page.