Standard Uranium advances 2026 drill program at Davidson River as Rocas program delivers targets

Standard Uranium advances 2026 drill program at Davidson River as Rocas program delivers targets

From Proactive - Interviews for investors by Proactive

May 7, 2026 · 4 min · Episode 14309

About this episode

Jon Bey discusses Standard Uranium's exploration strategy and upcoming drill program at Davidson River.

Standard Uranium CEO Jon Bey joined Steve Darling from Proactive to provide an update on the company’s exploration strategy, highlighting final-stage planning for its 2026 drill program at the Davidson River Project, alongside promising early results from the Rocas Uranium Project. At Davidson River, the company is preparing to drill across the Warrior, Bronco, and Thunderbird conductor corridors, targeting basement-hosted, high-grade uranium mineralization. These targets lie along the same regional structural trends that host some of the Athabasca Basin’s most significant discoveries, including Arrow Deposit, operated by NexGen Energy Ltd., and the Triple R Deposit, operated by Paladin Energy Ltd.. Bey explained that the upcoming drill campaign will utilize two rigs operating simultaneously, a strategy designed to maximize drilling metres and accelerate the evaluation of what the company considers its highest-confidence targets identified to date on the property. These targets have been generated through the integration of multiphysics datasets, including historical drilling, ground gravity surveys, electromagnetic (EM) conductor mapping, and advanced machine-learning analysis…

People in this episode

Host: Steve Darling

Guest: Jon Bey

Topics covered

  • uranium exploration
  • drilling program
  • mineralization
  • geophysical surveys
  • machine learning
  • resource investment

Keywords

  • Standard Uranium
  • Davidson River
  • Rocas Uranium Project
  • drill program
  • uranium mineralization
  • geophysical data
  • machine learning

Mentioned in this episode

Organizations: Standard Uranium, NexGen Energy Ltd., Paladin Energy Ltd.

Places: Davidson River, Athabasca Basin, Rocas Uranium Project

More episodes of Proactive - Interviews for investors

Explore listener stats, chart rankings, contacts and more on the Proactive - Interviews for investors podcast page.