The Uptime Wind Energy Podcast
by Allen Hall, Rosemary Barnes, Yolanda Padron & Matthew Stead
Last updated Oct 27, 2026Is this your podcast?Uptime is a renewable energy podcast focused on wind energy and energy storage technologies. Experts Allen Hall, Rosemary Barnes, Yolanda Padron, and Matthew Stead break down the latest research, tech, and policy.
Insights from recent episode analysis
On the show
- Michael Tosi1 ep
- Paul Russo1 ep
- Dr. Kenneth Williams1 ep
Also: Howard Penrose, Morten Handberg, Bret Tollgaard
Audience Interest
Podcast Focus
Publishing Consistency
Insights are generated by CastFox AI using publicly available data, episode content, and proprietary models.
Most discussed topics
Brands & references
Total monthly reach
Based on 1 signal.
Built from
By chart position
- 🇺🇸United States · Earth SciencesHOME#6142K to 222K
- 🇮🇪Ireland · Earth Sciences#126K to 138K
- 🇮🇳India · Earth Sciences#1912K to 62K
- 🇰🇷South Korea · Earth Sciences#1011K to 60K
- 🇩🇪Germany · Earth Sciences#258.0K to 42K
- Per-Episode Audience
Est. listeners per new episode within ~30 days
160K to 847K🎙 Daily cadence·300 episodes·Last published yesterday - Monthly Reach
Unique listeners across all episodes (30 days)
534K to 2.8M🇺🇸26%🇮🇪16%🇮🇳7%+20 more - Active Followers
Loyal subscribers who consistently listen
294K to 1.6M
Market Insights
Platform Distribution
Reach across major podcast platforms, updated hourly
Total Followers
—
Total Plays
—
Total Reviews
—
* Data sourced directly from platform APIs and aggregated hourly across all major podcast directories.
| Date | Episode | Topics | Guests | Brands | Places | Keywords | Sponsor | Length | |
|---|---|---|---|---|---|---|---|---|---|
| 10/27/26 | Ming Yang Eyes 33 MW Turbine, Greenvolt Delays FID | Ming Yang plans a 33 MW turbine while China pulls European tech out of its wind farms. Plus white-hat hackers reach 7.8 GW in Germany, Vårgrønn eyes a Greenvolt exit, and who really owns turbine data. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 26m 17s | ||||||
| 10/26/26 | Trump Delays Turbine Tariffs, Pentagon Approves Two Projects | Trump skips turbine tariffs, the Pentagon clears two wind farms, the DOJ targets Revolution Wind, and China pushes into Europe. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 5m 41s | ||||||
| 10/22/26 | Tightline and Avient Remove Peel Ply From Carbon Planks | This week we’re revisiting our discussion with Andrew Davis of Tightline Composites and Brad Schmidt of Avient, who discuss a resin additive that eliminates peel ply on carbon planks. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 25m 45s | ||||||
| 10/20/26 | Nordex Q3 Orders Jump 30%, Vestas Bets on Australia | Nordex Q3 orders jump 30% and Vestas lands about a gigawatt in Australia. Plus why turbine factories skip Australia, high project costs, and whether batteries can replace coal. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 25m 59s | ||||||
| 10/19/26 | Trump Targets Revolution Wind, Nordex Q3 EBITDA Doubles | Allen covers the Trump administration’s bid to reopen Revolution Wind’s permit, a bipartisan Senate permitting deal, Nordex’s doubled third-quarter profit, and GE Vernova’s new wind chief. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | — | ||||||
| 10/15/26 | How CICNDT Qualifies Inspectors for Complex Blade Scans | Jeremy Heinks, founder and CEO of CICNDT, joins to discuss the inspector shortage, Level III oversight, blade samples, drone thermal limits, and IEC updates. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 26m 38s | ||||||
| 10/13/26 | China Barred Vestas Software, Ørsted Buys Chinese Monopiles | Vestas CEO Henrik Andersen says China barred Vestas from monitoring its own turbines. Plus Ørsted takes heat for Chinese monopiles, India’s blade design gap, and tents that beat weather delays. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 20m 55s | ||||||
| 10/12/26 | Ørsted Finishes Drone Trial, Iberdrola Exits South Korea | Allen covers Ørsted’s Hornsea 2 drone trial, the DeepWind test site, Germany’s proposed land rent cap, and Iberdrola’s Korea exit. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 3m 03s | ||||||
| 10/8/26 | How DTU’s Rain Test Facility Predicts Erosion | Rosemary visits DTU Wind & Energy Systems in Denmark, where Nicolai Frost-Jensen Johansen explains rain erosion testing, tip speed, and LEP defects. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 29m 29s | ||||||
| 10/6/26 | What Rosie Learned in Europe’s Wind Turbine Test Labs | Rosie returns from Denmark and shares her experiences seeing DTU blade testing, a lightning lab, and a 15 MW Vestas test turbine. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us! | 29m 56s | ||||||
Want analysis for the episodes below?Free for Pro Submit a request, we'll have your selected episodes analyzed within an hour. Free, at no cost to you, for Pro users. | |||||||||
| 10/5/26 | Why Vestas Wants Chinese Wind Turbines Off Europe’s Grid | Allen covers how Denmark, where modern wind began, is pushing back on China, as Vestas CEO Henrik Andersen argues to keep Chinese turbines off Europe's grid. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Happy Monday everyone. Denmark taught the world how to build wind turbines. This week ... three Danish stories asked the same question. What happens to the country that started it all ... now that China builds most of the world's turbines? The answer begins with a man who has been doing this for thirty years. In nineteen ninety-six ... a Danish developer put up his first wind turbine. Back then, turbines were going up all over the countryside. If the numbers worked ... you built it. Today he runs Lisby Windpower. And he says developers like him are a dying breed. They are small and local ... and they build with their own money. If a project goes wrong, he takes the hit. So he has always treated his neighbors right. He remembers when those neighbors came to the turbine parties and ate red sausages on bread. Now the big multinationals have moved in. He says they can promise a local family a lot ... and be gone tomorrow. Meanwhile, onshore building in Denmark has nearly stopped. But he is not bitter. His latest project is Denmark's first commercial wind turbine battery. He says the industry is better at everything today ... even if the work is harder. While the old guard fades ... Denmark's biggest wind company is fighting a very different battle. It is run by a man who grew up in Jutland. As a boy, he would stare out his window at the turbines turning in the distance. He wanted to know how they worked. As a young man, he bought shares in the company that built them. He admits it was not much of a success in those early years. He was a banker, not an engineer. But in twenty thirteen, that same company put him on its board. Its losses were nearing one billion euros. Six years later ... he was running it. That boy at the window is Henrik Andersen. And the company he watched ... is Vestas. Today Vestas is making money again. Operating profit last quarter was four hundred forty-six million euros ... up from fifty-seven million a year earlier. But Andersen is worried about China. Last year, for the first time, the five biggest turbine suppliers in the world were all Chinese. Goldwind alone installed nearly thirty gigawatts ... twice as much as Vestas. An economist at ING says Chinese makers can undercut European prices by as much as half. He says state support is the main reason. Even so, Chinese companies supplied less than three percent of Europe's new turbines last year. Andersen wants to keep it that way. He says China once barred Vestas from running its own software on its turbines there. So he asks a simple question. Why should Chinese turbines and software be welcome on Europe's grid? He says Europe should guard its energy the same way it guards its borders. The European Commission seems to be listening. In February, it opened an investigation into Goldwind's subsidies. And then there is Ørsted. Denmark's other wind giant has warned loudly about cheap, state-backed Chinese competition. But the Danish newspaper Berlingske reports that Ørsted buys some monopiles and cables ... from China. Ørsted's chief executive says that happens only in isolated cases. He says the turbines still come from Europe. The Danish trade group Tekniq is not satisfied. The Danish government owns most of Ørsted. Tekniq says that should mean European jobs come first. A Danish China expert sees the bind. Ørsted has to compete on price today ... while it asks the European Union to fix the price gap tomorrow. So what should wind professionals take from all this? First ... China's price edge is real. And even Denmark's champions feel it. When a state-owned developer that warns about Chinese subsidies still buys Chinese monopiles ... the gap is not small. European suppliers will not win that fight on price alone. Second ... security is becoming a selling point. Andersen is not really arguing about cost. He is arguing about who controls the software inside the turbine. If you build controls, sensors or monitoring systems for wind ... where your code comes from is about to matter a lot more. Third ... proven beats bigger. Vestas stopped chasing size and started chasing repeatability. Fewer redesigns mean fewer defects. And lenders trust a track record. Time in the field is the one advantage China cannot buy with subsidies. Danish developers may be part of a dying breed. But what that generation built ... thirty years of turbines that kept on turning ... is still Denmark's best argument. And that is the state of the wind industry for the 5th of October 2026. Join us for the Uptime Wind Energy podcast tomorrow. | 2m 49s | ||||||
| 10/1/26 | Morten Handberg Answers the Big Drone Inspection Questions | Morten Handberg answers the big questions around drone inspections, including how often to inspect, how many turbines to sample, and how much AI results should be qualified. Contact Morten on LinkedIn The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Speaker: [00:00:00] Welcome to Uptime Spotlight, shining light on wind energy's brightest innovators. This is the progress powering tomorrow Allen Hall: Morten, welcome back to the program. Morten Handberg: Thanks, Allen. Allen Hall: It is drone inspection season. Everybody in the Northern Hemisphere is either having drone inspections done right now or about to, before the, the winter weather hits. There are a lot of decisions to make, of course, when you're doing drone inspections, and Morten, you and I were just talking about some of the difficulties with drone inspections, particularly, and the, the highest level one is always how often and how many should we be thinking about it when we're gonna do drone inspections? How, how often should you do it, and how many turbines out of the total should you sample? Morten Handberg: Well, it really depends on what it is that, that you want to see, [00:01:00] uh, and, um, what it is that you want to achieve. I would always argue for doing annual, uh, uh, blade inspections, um, both internally and externally, because you want to know what is the overall condition of your wind farm. That's not to say that you need to inspect every single blade every single year. I don't think that necessarily adds value. Uh, if you have a service contract that covers that and gives you an annual inspection, that's great. But there might still be a benefit for you to do a, your own sets, uh, because your service contract will typically not cover internal inspections, and it will, it will limit the amount of information you have available that you can then use to understand your, uh, your wind farm condition, of your blade condition, and also what actions you need to take in terms of erosion, lightning, structural damages. So I will always go for arguing for a subset, uh, both externally and internally, and then divide it out into the wind farm, uh, because you want to have [00:02:00] a, a, a, as divided a, a pool of ins- of, uh, of, of, uh, in your subset as possible, because that give, gives you the broadest understanding about what's going on. And from there you can then decide, okay, is there something serious going on? Is there any seal defect? Are there major lightnings? Is erosion an issue? And then you can trigger more inspection, but so, so you can use it to, to, uh, argue for more value in inspections. Allen Hall: But Morten, I have a full service agreement, and my OEM is doing inspections, I think. Isn't that good enough? Morten Handberg: It's a good start, um, and it means that they are fulfilling their part of the service agreement. Um, but- How they categorize and to what detail that you can get access to really matters in terms of what value you get out of it. If you only get the report and you only get the thumbnails, then you only see a, a small piece of what is actually going on on the blade. If your OEM is doing, um, [00:03:00] you, you know, if they are, if they're doing the best job in the world and they're pristine in all of their assessments, then okay, that's good. But, um, I don't think that, y- you know, it's, uh, we, we can, we, most of us can probably agree that, that it's not always the 100, 100% that, that we, that we see from these inspections because they are, they're done in massive amounts, and that means that the quality in the reporting goes down. So, so it, it limits you in what you can actually learn from these reports, both in terms of the quality and the assessment, but also just in the amount of information that is in the report. And thereby, if you really wanna have a good understanding about what is actually my wind turbine co- my wind, uh, wind farm condition, then having your own, own data set really helps you out. Allen Hall: But Morten, usually when an OEM provides a, a set of inspections, it is just a, usually, like, just a couple of turbines. And I assume that the OEM is just telling me about the, the things that are serious. Everything else must be okay, right? Morten Handberg: Well, typically, it's everything that they show. Um, so, [00:04:00] um, at least some of the reports that we see that, you know, every single defect is, is, uh, that they have found is marked out. Um, but there is a, there can be a lot of inconsistencies in, in how things are annotated, um, both in terms of structural, in terms of erosion defects, uh, and If you wanna make a, if you wanna have a, a, a claim or you want to make a, um, an, a, make a proper repair campaign, then having the, having the right annotation and the, and the, and the correct, uh, assessment is really important for you because it's really important when you plan a repair if you know that it's this contamination or is it a crack. It's really important for your leading edge erosion campaign to know is the cause of my erosion because of rain erosion or is it because of peeling from, uh, poor adhesion or is it because of voids in, um, in my, uh, in, in, in the blade that is causing the coating to fail because that means a lot in, in terms of what solutions you [00:05:00] should, you should use to, to mitigate it. Allen Hall: Is there a, a better approach? Uh, because what I see somewhat globally at this point is that if an operator has a full service agreement and they're running, let's just say they're running 10, 15, 20 different farms and they're spread out over a large geography. So the, there isn't like you can drive between them. They're hundreds of miles apart. There's no way that the owner operator can get into that level of detail. They have to let the OEM drive that ship, so to speak, where they, they, at least the first cut is done by the OEM. Has that historically been the best method or it, does that lead to problems down the road? Because I, I think the quality and the maybe the consistency there of, of the inspections varies from year to year and who the supplier was that actually did it. Was it the [00:06:00] OEM with a DJI drone and one of their technicians doing inspection, or is it, or, or was it like a proper drone company that has high resolution, uh, inspection equipment doing that, uh, series of inspections? There just seems to be so many variables here. But me as the owner operator, there's not enough time in the day for me to go do all this myself. I have to rely on somebody to, to do the right thing. What is that mix? Like, how much do I rely upon that OEM to provide the information, the, the really, the real information? Is it 100%? Like I completely have to totally trust them? Or is it more of like a 20%, like I'm going to sample what there's, what they're telling me myself? I'm gonna... I need to do a, basically a double inspection, a re-inspection of what I was told to make sure that was true. Uh, where is that, where's that line? Morten Handberg: I think that if you are a seasoned operator, you've been running your wind farm for 10, 15 years, you've been [00:07:00] using your OEM for all that time, and they have provided good reporting for you, and you've been happy with the results, and you've been happy with the repair campaigns, then you'll probably have a re- pretty good regional management of that area, and then I would be okay with that. Um, but that is not always what we see. Um, so it's, it's fair to, to, to pressure test it and to make sure that what you're being, uh, provided is accurate. So I would say if you're, if, if your, if your wind farm is new or you're new to your relationship with your OEM, then doing a subset will give you some, uh, good understanding what is the OEM actually providing you, and are you seeing the full, full picture, and are their annotations correct? Um, if that matches one-to-one, then that means that the O&Ms go and doing a good job, which is good, and that's what we want. If not, then you know [00:08:00] that you have-- that there is a need for you to take, uh, some more control in order to keep your asset healthy, which is what we want, and to be proac- be more proactive in handling some of the, some of the issues. Because if you're not, then you could end up with severe erosion issues that are being neglected or misrepresentate-- misrepresented. You could end up with structural damages that are either, uh, blown out of proportion, that where they are-- where the, the method to, to rectify it, uh, means that you-- it's something that could be repaired is getting replaced, which means a massive amount of cost on your side. Um, could also be that a, uh, that a serious issue is getting, getting ne- neglected and then turns into something much more severe, um, afterwards. A- and again, it's about finding out where that balance is. Uh, and again, there, uh, the easy way is simply-- It's not-- The best way is not for you to do [00:09:00] a full sweep, one-to-one, 100% inspection of everything, because that will just, uh, that will just mean a lot of data that you need to de- you need to manage and control. You might not get full value out of it. That's very doubtful. But doing a smaller subset of, you know, some, you know, um, 10, 15 percentage, uh, of the wind farm will give you an understanding about where you actually are in, in, in the, in the, in the condition of your wind farm. And something I would, I would actually argue for it both within warranty, during warranty, and also afterwards. Because within warranty,... | 34m 55s | ||||||
| 9/29/26 | Uptime’s Takeaways from Hamburg 2026 | The crew discusses Hamburg takeaways, including the industry mood, bigger blade risks, and OEM announcements. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Matthew Stead: [00:00:00] Every time Rosie walked past a, a, like a, a QR code with a, a prize of Lego, she had to enter. Rosemary Barnes: Yeah. I'm Matthew Stead: n- I'm not quite sure, I'm not quite sure whether Rosie was actually entering her real name. Rosemary Barnes: Oh, just like 100, 100 different fake emails. Um- Matthew Stead: Yeah. Rosemary Barnes: Yeah. And I also- Matthew Stead: Yeah ... Rosemary Barnes: do think I could grab one and run. I was considering it, 'cause, you know, I've been to a few of these events now. I would have entered probably 20 competitions, and I never, I never win Speaker 3: The Uptime Wind Energy podcast, brought to you by StrikeTape. Protecting thousands of wind turbines from lightning damage worldwide. Visit striketape.com. And now your hosts Allen Hall: Welcome to the Uptime Wind Energy podcast. I'm Allen Hall, and I'm here with Rosemary Barnes, Yolanda Padron, and Matthew Stead. And this has been a busy week because everybody's been, well, Matthew and Rosemary have been in Hamburg for the big Wind Energy Hamburg show. Organizers [00:01:00] there expect 43,000 people from 100 countries to attend. There's roughly 1,600 companies and booths on the show floor. Uh, this is the big show, right? Everybody knows this is the big show, and this is the one to go to. Matthew, you were with EOLOGIX-PING for the week in the booth there. How, what, how did it go? How was it? Matthew Stead: Uh, I don't think I've talked for, um, eight hours a day for three days in a row ever. So it, it, it was, it was crazy. So, um, uh, there were so many people there. I think, um, I, I ... There, there was some mixed feelings. So there was a lot of positive vibe about what's going on and how the industry is progressing and doing better. But at the same time, there were sort of negative comments about, like Germany next year, they were really expecting a, a big drop in the number of installations. So it was quite a mixed bag. Um, but I mean, personally, I loved seeing old friends. Allen Hall: And Rosemary, you were not tied to a [00:02:00] booth, so you could wander around a little bit more. What did you see and hear at the show? Rosemary Barnes: Uh, a lot. I have actually learned what a booth is for now, though, because if you don't have a booth, then you have to, like, just go from You try and meet people, and you have to navigate your way through the system, and you can't actually make appointments because you chat, you run into somebody, and then you chat to someone. And, like, you think, "Oh, I'll talk to everyone for five minutes," but you end up talking for 15 or 20 minutes. And yeah, so lots of, lots of walking. But, um, I've seen, I've seen heaps. I love these exhibitions, you know, when they've got the ... lot, a lot of them have displays. So, you know, like, there's a real, a real winch in there. I can't remember what company it was from, but it's, like, a real winch that's been in service for a long time. And you know, you can go get a sense for, uh, that scale. Real bits of rope. Um, oh, so many robots. So many robots and drones. Um, yeah. All, all kinds [00:03:00] of varieties of robots and drones, which I love. Lots of them doing very useful things. Uh, I don't know what else. About, yeah, every other stand has some, one of my ex-colleagues from LM Wind Power standing in it, in, um, a wide variety of industries. So that's kind of cool. I actually, I had some really, really great conversations with old colleagues. And, um- Allen Hall: Mm. Rosemary Barnes: Mm ... yeah, l- learn, yeah, always learn a lot from that. Um, yeah. I don't know. It's been good. Lots of free ice cream as well. Uh, yeah. Free ice cream, free coffees, good coffees. Allen Hall: What were the good handouts this year? What, what were the free giveaways that everybody was distributing? Rosemary Barnes: There's a lot of chocolates, and it's quite easy to, yeah, just grab handfuls of chocolate. Matthew Stead: A weather dice. Is there light- is there lightning today, or is it windy? Allen Hall: Who was offering that, Matthew? Matthew Stead: Uh, this is, uh, GWU. Allen Hall: All right. That's, that's a neat handout, giveaway, [00:04:00] right? Matthew Stead: Great company. Allen Hall: Were they, were they auctioning off any cars or anything that was, like, super impressive? A million dollars? Matthew Stead: Oh, I gotta tell a story. Like, every time Rosie walked past, uh, uh, like a, a QR code with a, a prize of Lego- She had to enter. Rosemary Barnes: Yeah. I'm Matthew Stead: not, I'm not quite sure, I'm not quite sure whether Rosie was actually entering her real name or like a, a, a fake name. Rosemary Barnes: Or just like 100, 100 different fake emails. Um- Matthew Stead: Yeah. Rosemary Barnes: Yeah. And I also- Matthew Stead: Yeah ... Rosemary Barnes: every time try and convince them to just give it to me. Um, but all the LEGO is like Danish companies, and Danes are, I think, like literally the most honest people, um, most honest country on Earth. So- Matthew Stead: Yeah ... Rosemary Barnes: they never really, um, allow that. But I- ... do think I could grab one and run. I was considering it, 'cause, you know, I've been to a few of these events now. I would have entered probably 20 competitions, and I never, I never win, so. I Yolanda Padron: mean, you're fast enough. You could have beat them. Rosemary Barnes: They're limited edition sets that are not, no longer available [00:05:00] for sale or were never available for sale, so it's not like you could just say, "Oh, just go buy one, Rosie." But these sets are not, not available. There's, yeah, like lots of like little, um, offshore wind turbine and then a, like a substation. Yeah. Had like a little drone as well involved in that set. There's another, there's a Maersk has a ship with like, full of shipping containers. Um- Yeah. I, I don't know. Like, just lots of cool, cool Lego Matthew Stead: I even, even entered on Rosie's behalf Allen Hall: What was the vibe offshore, uh, versus onshore? 'Cause last time I attended, which was about four years ago now, there was a, a significant amount of offshore, uh, discussion and booths and vendors. Is the ratio growing more offshore versus onshore? Or what, what did that look like? Matthew Stead: I felt the opposite. I felt it was all onshore, but- Really? Rosemary Barnes: Yeah, yeah. I think so, and it's a real contrast. 'Cause when you go to the big wind, um, conferences in Australia now, it, it's always, like, 90%-plus offshore wind, which [00:06:00] we don't have in Australia, and I've always found it so weird. Matthew Stead: Hmm. Rosemary Barnes: And, uh, here in Europe where they do have a whole lot of offshore wind, and that's where, you know, like, most of their growth is, uh, coming in the industry for new installations- Matthew Stead: Hmm Rosemary Barnes: um, yeah, it's, it's a lot more, it's a lot more balanced. Um, it's just, like, a lot of small companies doing s- small things. I mean, it's not, like, really small. It's, you know, one small task in every single wind farm in the world. There's obviously still a huge market. But, you know, like, lots of just, like, really precision solutions to very specific problems, I guess. Yeah, there's just so much, uh, wind energy here, so many people that just, yeah, learned about a problem and came up with a, a way to solve it. Um, yeah, so it, it's, it's a really good balance. Allen Hall: Uh, while we're here, what were the new products on the show floor that you said, "Wow, that's something innovative"? Rosemary Barnes: Like, there's stuff... I learned stuff that I didn't know before, but I don't think that it's brand-new. Um, for example, I learned that you're not supposed to call a drone a robot. Um- [00:07:00] Allen Hall: Why? Rosemary Barnes: I think a drone is a class of robot. In my, in my opinion, a drone is a robot that flies. But I was told off for, um... I'm like, "Oh, do you have any other robots?" "No, we don't have any other robots. We've got drones." That's what they said. Matthew Stead: Yeah. Hmm. I learned, I learned two things, and I'm not sure if I'm allowed to say this, but anyway, I'll, I'll, I'll do it. Um, SkySpecs have a MC- MCP connector to their data For their customers. So for those AI nerds out there, that's a massive thing, I think. Rosemary Barnes: Can you explain what that is, Matt? Allen Hall: For us non-geeks. Matthew Stead: My understanding, and I'll, I'll be corrected by the audience, is that a MCP, whatever it stands for, um, is basically, uh, like an AI connector where you can query all your data that is h- hosted within- Oh ... SkySpecs. So- Rosemary Barnes: Ah ... Matthew Stead: Hey, Mr. SkySpecs- Okay ... um, which turbines have been struck by lightning, you know, have lightning damage, and how bad is it? And, [00:08:00] and then the next thing that SkySpecs has... Uh, I don't work for SkySpecs. Um, the next, the next thing that SkySpecs have is they have a more of a growth of damage over time and a predictor as to what the damage might look like next year. Um, strangely, Rosie, um, I also heard quite a few people talking about blade temperature. Um, and I know that's a sort of deep- Oh, really? ... rabbit hole. Yeah. Rosemary Barnes: Yeah, that's my obsession.... | — | ||||||
| 9/28/26 | Nordex Invests in Türkiye, Vestas Wins First V182 Order | Allen covers Nordex's Türkiye expansion, Chinese turbine makers seeking European partners, Vestas' first V182 order, and two Pennsylvania repowers. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Happy Monday, everyone. Well, in Pennsylvania this past week, two wind farms got a second life, and nobody poured a single new foundation. Now, hold that thought for a moment. This week, the wind industry kept asking one question: Where do you build? Let's start in Europe. Chinese turbine makers have a problem. They dominate solar, they dominate batteries, but in Western Europe, every major wind project still buys turbines from Vestas, Siemens or Nordex, and occasionally GE Vernova. So the Chinese are trying a new door, a joint venture. Envision and Mingyang both say they would partner with European companies to build turbines in Europe. Envision's chief product officer says they are prepared and willing. Its offshore chief hinted that talks may have already started, and they probably have. Mingyang still prefers its own factory, but Britain blocked that plan in Scotland earlier this year, so a local partner is plan B. It is the same play Chinese car makers used in Spain. Same playbook, same problem. So go south to Turkey. Nordex is not waiting for a partner there. The turbine maker put seventy million euros into Turkey this year. All of its own money, no loans and no incentives. A new factory near Izmir is building turbines now, roughly four hundred a year. Eight hundred and twenty workers today, about twelve hundred by year's end. A second factory is built and waiting for equipment. And here is the number that matters. Nordex buys one billion euros of parts from Turkish suppliers every year. Nordex says that is sixty to seventy percent of everything made for wind in Turkey. Then it ships many of those parts to other countries. Next month, Nordex will chase a big share of a fifteen hundred megawatt onshore tender. Interesting. Now east to India. Finnish composite maker Exel Composites just signed a deal with Suzlon. Exel's Indian joint venture will make carbon fiber planks for Suzlon's blade spar caps. The deal could top €100 million through March of 2029. It started small, €10 million in 2025, and back then Suzlon would not even let Exel use its name. Now it's 10 times bigger, and it's public. Every plank will come from one factory in India, close to the customer, close to the market. Smart move. Back to Europe and a turbine that is new but not too new. Vestas just booked the first order for its V182 7.2 megawatt turbine. Four machines, 29 megawatts. The Staverhult project in southern Sweden will take those turbines. The V182 sits on the EnVentus platform, and Vestas says it upgraded only what adds value for customers, nothing more. Serial production begins at the end of 2027, and there's a service deal, a 35-year-long service deal. Wow. Now to Pennsylvania, where the newest wind farms sit on old towers. Exus Renewables just finished repowering two wind farms in Cambria County, nearly 140 megawatts. There's new nacelles, new blades, new generators, but the same towers and the same foundations. The work adds 30 more years to farms that already ran nearly 20 years. Financing, about $356 million. And who's buying that power? A Fortune 500 technology company. Take your guess, right? Exus says buyers like repowered sites because they skip the long wait to connect a new project. And data centers are very hungry, and they do not want to wait in a line. So what should wind professionals take from this past week? First, local content is no longer a political favor. It is the price of entry. Nordex owns most of Turkey's wind supply chain, and the Chinese know that and want the same thing in Europe. And if you make towers, castings, or blades in Europe, expect a phone call from a Chinese company. You better decide now what your answer will be. Second, buyers are paying for certainty, not novelty. Vestas only changed what it had to. And Exus kept the steel that was already in the ground in Pennsylvania for their repower projects. You see, the fastest megawatt in America is the one that is already connected to the grid. Thousands of turbines from the early 2000s are reaching the repower age right about now, and that is really the next big market. And lastly, do the math on the service deal. The 35-year commitment is quite long, and a lot of operators are thinking about the length of their service contracts right about now. And that is the state of the wind industry for the 28th of September, 2026. Join us for the Uptime Wind Energy Podcast tomorrow. | 2m 54s | ||||||
| 9/24/26 | How Active Training Team Kept 25,000 Tideway Workers Safe | Dermot Kerrigan, Director and Co-founder at Active Training Team, joins to discuss how the immersive EPIC safety center helped London's £5 billion Thames Tideway tunnel finish with zero fatalities and zero life-changing injuries. Plus similar centers built for Ørsted's Hornsea projects and SSE, and the mobile program his US team runs for wind and solar sites. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Uptime Spotlight: Dermot Kerrigan, Director and Co-founder, Active Training Team Allen Hall: Welcome to Uptime Spotlight, shining light on wind energy's brightest innovators. This is the progress powering tomorrow. Dermot Kerrigan: Thanks very much for having me back, Allen. Allen Hall: Well, I brought you back because I want to talk about the major construction project in London that just wrapped up, which you were intimately involved with in terms of safety training through Active Training Team. That's the Thames Tideway project, a massive sewer project in London that started around 2016 and finished about a year ago, when I saw King Charles open and christen the new Tideway. And it's in operation today. Do you want to provide some background on what that project was and why it was even started? Dermot Kerrigan: Yeah, sure. We are a city now of around 9 million people, I believe. The sewage system that we have here was designed, I believe, for 2 million people back in Victorian times. And what was happening? Whenever we had a big storm, the sewers couldn't cope with all the water, so the excess poured into the River Thames, which runs through London, with huge, as you can imagine, health and environmental repercussions and risks. So it was decided that they needed to stop this by building a huge tunnel along the River Thames for 25 kilometers. Whenever this happened, rather than being poured into the Thames, it would go into this tunnel, be run downstream to the east of London, be treated, and then go back into the system. They decided to do this back in 2015, when the first spade hit the ground, and it just got commissioned. The final screws got tightened on it in March of this year, so that was an 11-year period. It employed 25,000 people over that period from various contractor companies, main works contractors and subcontractors who were tasked with building this thing. It went through a number of phases, from groundwork, literally digging holes, before they dug the big hole, which was the tunneling. There was pre-tunneling before that, and then, having done the tunnel, they actually built this thing and all the huge access shafts along the length of the river. The deepest point of the tunnel is 60 meters. It's a hell of a thing. You could drive two London double-decker buses through it at its widest point. Of course, after the tunneling phase, there was commissioning, building parkland along the length of the Thames, and landscaping, before they actually said this thing is open. That was in March of this year, and apparently 21 million tonnes of sewage have been captured by it so far. So it does seem to be doing the trick. Allen Hall: It's a massive project, and it's such a complicated project. As an engineer, I get really interested in the details of how that was going to work, because you're right, it's a Victorian-era sewer system, a massive sewer system that was built way larger than the recent tunnel, of course. But the complexity of tying a new sewer system into a roughly 150-year-old sewer system is complicated. Add the factor that you're working with water, with the Thames, and you're working with sewage, which is obviously dirty and full of contaminants. That puts a lot of risk on employees, contractors, construction workers, everybody involved in this process. So conceptually, we're going to dig a tunnel and put a couple of shafts in. I think they put about 30-odd shafts along the riverbanks to capture the effluent. But the complexity of it is crazy, to the point that, at least in my head, there was almost no chance that someone wasn't going to be seriously hurt or killed during that 10- or 11-year period. Drowning is a real possibility. Tunnel collapse is a possibility. Shafts collapsing is a possibility. You're dealing with cranes and heavy objects moving around, and steel and infrastructure. Someone's going to get seriously injured during this period. And the way construction projects work at this scale is that they have estimates, based on previous history in the UK, of how many people are going to be injured and how many people are going to be killed during the project. Two or three people were expected to be killed, and over 100 seriously injured, with life-altering injuries. That's alarming. But that explains why they called in Active Training Team and a number of others to come in and change the safety narrative. And that's where you come in, because I think the results have been astounding. First, I want you to describe what you did. What did you put in place, and why was it different at the time from other safety programs? Dermot Kerrigan: Well, I think safety up until 2015 on these big infrastructure projects was very much about systems and processes. What people weren't really taking notice of is the whole battle for hearts and minds. What this project was determined to avoid was the bare minimum that they could expect. And they were told, you're absolutely right, that the best you can hope for on a big 5 billion pound project like this over a 10- or 11-year period is to kill at least two people, with 150 serious, life-changing injuries and thousands of lost time injuries. They didn't want that. They were determined that wasn't going to happen. So they had to get a bit left field. They started looking around at other projects that had done something maybe a little bit out there, and they came across us, Active Training Team. We'd done some work with another big infrastructure project called Crossrail, which is an east-west rail line that opened some time ago, called the Elizabeth Line, that runs through London. We did this thing for them called the Target Zero Roadshow, which the contractors had to go through. It was a blend of film, live drama and facilitated discussion, where we showed an incident, the antecedents that led to it, and the consequences for all involved. It was a mobile thing. We took it from site to site, but it was pretty out there in terms of this blend of different media. So the people who ran Tideway at the time approached us and said, look, if we gave you carte blanche to do whatever you wanted, if we asked you to build this mad induction center that everybody has to go through to give them a life-changing experience before they start work on this project, to make them think, I need to do the right thing when it comes to safety, what would you do? We had this idea based on immersive theater, which is a big thing here in the UK, where you take a space, divide it into various sets, and take people on a multimedia journey where they see, in real time, if you like, the events that led up to a serious incident, the incident itself, and what happens after that. But then you give them some safety leadership tools and parachute them back into that scenario to practice those tools in real time. It's all to do with challenging and accepting challenge, and creating a culture of psychological safety where people feel absolutely able, where it's a no-brainer, to say, whoa, whoa, whoa, I'm not happy with that. Sorry, let's reconsider. Let's plan again. And to our incredible surprise, they went for it. They spent over 1 million pounds on building this state-of-the-art facility in central London. Everybody who was going to work on that project, whether they were a contractor with a spade in their hand, a receptionist in an office, somebody in the back office, or leaders, everybody who was going to set foot on either a site or an office on the Tideway project, had to go through this one-day experience first. The idea was that everybody bought into the ethos that operational safety isn't just the responsibility of operational people. All of us have a part to play to ensure that the guys doing the hands-on work go home in one piece. Allen Hall: I think that's a remarkable difference from a lot of the training programs we have seen in the renewable energy sector. A lot of times, the safety discussions are focused on the ground-level people, the people actually doing the heavy lifts, moving the trucks around, and doing that work. But the reality is that decisions are made throughout the organization which have an impact on safety. Management has an impact on safety. Procurement has an impact on safety. Just by choosing a less expensive safety device, you could increase the safety risk. And unless we have thought through those processes, we're still going to have big-time problems with accident rates. I think this is where Active Training Team really changed the narrative a good bit. But I think you don't sell the in-person aspect of this enough. I've taken the course two times now, and both times it was so emotionally impactful that it's hard to forget. There's a difference between watching a video, or going to a movie with your wife or somebody, where there's an emotion to watching the movie and being engrossed in it for an hour or so, or even going to a stage play, which is even more person to person, with a real-life person enacting the script, versus putting yourself in the situation. That's the immersive part of the EPIC center and Active Training Team's process. When you put yourself in that role, it becomes personal. And obviously, you're an actor,... | 28m 41s | ||||||
| 9/22/26 | GE Vernova and Vineyard Wind Settle, UK Approves Irish Sea Cables | GE Vernova and Vineyard Wind drop all claims in their $4.5 billion dispute. Plus the UK approves Irish Sea cables for Morgan and Morecambe, a GE turbine order in Japan, whale recorders in the Celtic Sea, and previews of WindEnergy Hamburg.Register for the SkySpecs Customer ForumMeet with Nikki Briggs at WindEnergy Hamburg to discuss the StrikeTape Ultra LPS upgradeFind Rosie & Matthew at Booth A1-115 at WindEnergy Hamburg The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Speaker: [00:00:00] The Uptime Wind Energy podcast, brought to you by StrikeTape. Protecting thousands of wind turbines from lightning damage worldwide. Visit StrikeTape.com. And now your hosts Allen Hall: Welcome to the Uptime Wind Energy podcast. I'm Allen Hall here with Rosemary Barnes and Jelanta Padron. And f- first off, Rosemary is in Denmark in preparation to visit Wind Energy Hamburg. Rosemary Barnes: I am. I'm in, uh, Ringkøbing, which is on the west coast of Jutland. Just, uh, took the, a train and hired a car from Copenhagen. Drove past a whole lot of wind turbines. It's very nice to be back. Allen Hall: So the Wind Energy Hamburg event is the event, in my opinion. There's really two, right? Wind Europe and Wind Energy Hamburg. Uh, Husum is a big event, but not of the scale of Wind Energy Hamburg. I think they're [00:01:00] predicting 40-ish thousand people probably are gonna come through the event. It's massive. Have you been there before, Rosemary? Rosemary Barnes: I haven't. I've only been to WindEurope once, and other than that I've been to some big composites conferences back when I was doing my PhD, but I'm kind of, like, 'cause y- when I went to WindEurope last year, that was my first big wind energy conference, and I was so overwhelmed. I walked in the door, I saw the exhibition, and within 90 seconds all the energy had drained from my body and I'm like, "I wanna go home now." But, um, so I've kind of like, I, I have just, I've spent a couple of days in, in Copenhagen and surrounds and, um, and that, that was really good. Lots of talking, lots of seeing stuff, and I'm sure we'll talk about that in a minute. Um, but now I have preemptively, like, taken myself to a quiet corner of Denmark to just, yeah, like, put my, put my head down and, uh, yeah, have some quiet activities, some n- nature. The nature is really nice over this [00:02:00] part of Denmark. There's lots of... Like, I wanna go for some long runs in sand dunes and heaths and, um, yeah, planning to drive up to Østerild where there's a big wind turbine test center. Uh, I just wanna see what's there just out of pure, pure geekiness, see what's there, 'cause y- you know, like, there's new, new stuff there, right? And there's often, like, offshore wind turbines being tested. I don't know what's there. That'll be cool to see. Um, and yeah, I'm trying to put together a video about how wind turbines are tested, so that will be part of it and, yeah, potentially a good recording location. So yeah, just a bit of quiet time, trying to rest up ahead of next week where I know that there will be just so many conversations. I love, I love talking about wind energy technology, and I love catching up with old people that I know, but I just, I'm not an extrovert. Um, yeah, at best an ambivert maybe, slightly introverted. I was actually discussing this with somebody, how, like, inappropriate it is to have such [00:03:00] sensory overload at, um, a conference that is mostly attended by engineers. It's, like, we're not known for being, you know, like, really social people. Um, and we came up with the idea that there should be, like, a what? A sensory deprivation room in there where, um, you know, you can just go in and like- Oh my Yolanda Padron: gosh, that would be Rosemary Barnes: great yeah, like, get in a, one of those tanks or a soundproof booth, uh, star- just yeah, so, like, you can just go in and reset and, um, yeah, refill your social battery. I think that that would be, yeah, that would be a real, a real winner if someone... I'm sure someone could charge a, charge money for that there. Or you sell the sponsorship for, like, a million dollars because it's just so popular and everyone's so grateful that it exists. Allen Hall: Well, Ro- Rosemary, if you want to talk to Rosemary, she's gonna be hanging around the EOLOGIX- I'm gonna be hiding ... Ping Booth. Oh. She may be hiding, but she will be somewhere near the EOLOGIX- You can find her ... Ping Booth. Yeah. Y- you just listen for the Australian accent and a bunch of, uh, German [00:04:00] accents, right? It's pretty easy to pick out in my opinion. Austrian. Oh, yeah, and Austrian too. Yeah. So there, there's, um- A, a ton of people, obviously, that we know are gonna be at Hamburg for the week. It, it starts Tuesday. I think it finishes on Friday. Uh, uh, Rosemary will be there, Matthew Stead will be there, our own Nikki Briggs from Weather Guard will be there. When you run into them, say hi. Uh, although Rosemary talks about not being so social, she's very social, so- Rosemary Barnes: That's my problem, is that I get really social and then I get exhausted, like absolutely exhausted. Allen Hall: Yeah. Yes. So, uh, uh, it'll be a fun time. I hope everybody has a good time and, and all the travels to and from are safely done. Uh, so go visit, uh, EOLOGIX-PING. Our, our friends at CNC Onsite will also be there. Uh, they have some big announcements, uh, having to do with, uh, a new place in the United States. PES Wind will be there. Uh, s- I think [00:05:00] Stefan's gonna be there, so say hi to Stefan and pick up the, the newest copy of PES Wind. There's an article by Weather Guard in PES Wind, uh, so go ahead and pick one of those up. Uh, and, uh, one of the o- items before we get too deep into the news this week, the SkySpecs Forum. So if you work with SkySpecs or if you d- even if you don't and know SkySpecs, obviously a huge, uh, drone inspection company doing CMS and vendor management and all the above They're having their SkySpecs Forum October 6th and 7th in Detroit, uh, at the MGM Grand, which is a, a magnificent place. Uh, and if you're, are involved in inspections of blades or deal with CMS or doing a lot of repairs on wind farms, you should try to get to the SkySpecs Forum. There are onl- as I understand it, there's only a couple of seats left, so y- you need to go to SkySpecs and register for that event and get yourself to Detroit. So just [00:06:00] a note, if you really want to go, and you should, you better do it quickly. Well, there's good news out of Massachusetts, which doesn't happen all that often lately. Uh, Vineyard Wind and GE Vernova has settled their fight. Now, GE Vernova had tried to quit the $4.5 billion project, and it said the developer owed it about $360 million. Well, GE Vernova has pulled back that threat, and thank goodness. It, it has dropped all its courts appeals, and both sides are dropping every claim. So everything that was happening in the court cases in Massachusetts are all gonna go away, and GE is gonna be on site to, uh, support Vineyard Wind, which, Yolanda, has to be a huge win for both sides and the state of Massachusetts, which is the recipient of a lot of that electricity. Yolanda Padron: Absolutely, and it's a win, too, for just the US offshore market in general, right? It's, it's something that's been happening for quite a bit of time. [00:07:00] Uh, we were talking about it pre-recording, that this is-- the idea of, of settling in court is really not typical for onshore or offshore. It's kind of, it's almost like a game of chicken, I feel like, and this time it just, it took a little bit longer than, than usual for them to settle on something. But happy that they settled. Um, yeah, no, this is a big, a big win for the US. Allen Hall: Yeah, the optics around it was just bad for US offshore wind. With everything else going on, to have two of the bigger parties fighting one another in court is, that just did not look good. And I, I think everybody knew at the, at the time, I think Rosemarie had said it even, that they're gonna have to settle. They're gonna have to work together. That, that's the only outcome that, that can happen here. No one is walking away from this project. That will not happen. So it's good this has finally been settled, because we gotta get moving on. I know there's, there's, contrary to what you probably hear in the press, there are some other [00:08:00] offshore wind farms that are still being constructed quietly, dutifully, and will be done roughly on time. So more to come on the US offshore side. So GE also has better news this week. They won a turbine order in Japan, and we'll have that after the break. Delamination and bondline failures in blades are difficult problems to detect early. These hidden issues can cost you millions in repairs and lost energy production. CIC-NDT are specialists to detect these critical flaws before they become expensive burdens. Their nondestructive test technology penetrates deep into blade materials to find voids and cracks traditional inspections completely miss. CIC-NDT maps every critical defect, delivers actionable reports, and provides support to get your blades back in service. So visit cicndt.com because [00:09:00] catching blade problems early will save you millions Well, GE Vernova has won an order in Japan. It'll supply seven turbines to Eurus Energy. That wind farm will be up in, in the northern part of the country. Uh, it's a small market obviously for GE Vernova, but it is a steady one and it gives a,... | 27m 23s | ||||||
| 9/21/26 | Ørsted Finishes Revolution Wind, RWE Wins German Auction | Allen covers record bank financing for clean energy, Oracle's 1.7 GW Texas wind deal, RWE's German auction win, Denmark scrapping its turbine cap, and Revolution Wind finishing off Rhode Island. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript September 18, 2026Happy Monday, everyone.Off the coast of Rhode Island this past week, the last turbine went up. Hold that thought. First, the banks.BloombergNEF says global banks put one-point-one-five trillion dollars behind low-carbon energy last year. A record. For every dollar banks lent to fossil fuels, they lent ninety-seven cents to clean energy. Five years ago, that ratio was seventy-nine cents. Wind project finance in Europe grew seventy-five percent in a single year. The money is moving. And here is where it lands.In Texas, Oracle just signed wind energy deals across ten projects. One-point-seven gigawatts. Partners include RWE, Engie, Clearway Energy, and Scout Clean Energy. All feeding the ERCOT grid. All powering Oracle's data center campus in Abilene. Oracle wants one hundred percent of its AI data center electricity matched with carbon-free power by twenty thirty-five. Big tech needs big power. Wind is answering.Now cross the Atlantic. RWE won one hundred and nineteen megawatts of onshore wind in Germany's latest federal auction. Two projects. The first, Juchen Three. Eighty-four megawatts on reclaimed land at the former Garzweiler coal mine in North Rhine-Westphalia. Wind turbines, on a former coal mine. The second, Seedorf in Lower Saxony. Five old turbines totaling nine megawatts, replaced by five modern machines at thirty-five. Nearly four times the power. Same number of towers. Both projects target twenty twenty-eight.And just north of Germany, Denmark just made a move. The Danish government scrapped its cap on onshore wind turbines. That cap was set in twenty eighteen: eighteen hundred and fifty turbines by twenty forty. The government's own forecast says Denmark will need thirty-three hundred. Climate Minister Samira Nawa said tearing down working turbines because of an old cap would be outrageous. But the Danish Chamber of Commerce warns: more turbines need more grid.Now, back to Rhode Island. Ørsted's Revolution Wind has installed its sixty-fifth and final turbine. Seven hundred and four megawatts. Six-point-two billion dollars. The federal government issued two stop-work orders against this project. Federal judges threw them both out. Revolution Wind kept building. It joins South Fork Wind and Vineyard Wind as the third completed large-scale offshore wind farm in the United States. During Winter Storm Fern, Vineyard Wind showed up big for New England. During the July heat wave, offshore wind kept oil-burning peakers quiet.So here is what matters. Banks are lending at near parity with fossil fuels. Big tech is signing gigawatt-scale wind deals. Turbines are going up despite political headwinds. The constraint now is the grid behind them. Denmark said it this week. Germany's offshore foundation said it last month. The next decade of wind energy growth will be won or lost on transmission and interconnection. Not turbines. Not money. Wires.And that is the state of the wind industry for the 21st of September 2026. Join us for the Uptime Wind Energy podcast tomorrow.Sources:BloombergNEF — Low-Carbon Bank Financing Tops One TrillionCanary Media — Major US Offshore Wind Farm Installs Its Last TurbineDCD — Oracle Signs 1.7GW of Wind Energy Supply Agreements in TexasRWE — RWE Secures 119 MW of Onshore Wind in Latest German AuctionEnergyWatch — Denmark Scraps Onshore Wind Turbine Cap | 4m 08s | ||||||
| 9/17/26 | How CNC Onsite Cuts Repair Delays for US Operators | Søren Kellenberger, CEO at CNC Onsite, joins to discuss the company's new US office, uptower yaw ring repairs, and blade root insert replacement. Email [email protected] to learn more. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Welcome to Uptime Spotlight, shining light on wind energy's brightest innovators. This is the progress powering tomorrow. Allen Hall: Søren, welcome back to the program. Søren Kellenberger: Thank you very much, Allen. It's a pleasure. Allen Hall: Well, you have some really exciting news in the United States, because CNC Onsite has been growing tremendously. You're now worldwide, and you've established a presence in the United States. Søren Kellenberger: That's correct. We have been working in the US for quite some time, but we see that the demand is definitely there. The North American market has more than 100,000 turbines above one megawatt. So of course it's an interesting market, and we think that now is a good time for us to make that move and establish ourselves in the US. So we are really looking forward to that. Allen Hall: So you've seen a lot of growth in the company over the last couple of years as operators worldwide realize they have problems that they can't solve, and that will only be solved by precision machining, which is what CNC Onsite does. Where have you been doing work lately? I've seen things on LinkedIn from Asia, but I know you guys are pretty busy right now. Søren Kellenberger: As you started saying, we are basically working globally. So we have had technicians in Australia and Japan, and in other Asian countries as well. Our main market is still Europe, where we also started, and we are widely spread across Europe. But the US, including Canada, is becoming a very interesting and important market for us. Maybe the best way to explain it is that even though we are based in Denmark and working out of Denmark, 90% of what we do is outside of Denmark. And once you travel — whether you travel to Finland or if you travel to somewhere in the US — it doesn't make a huge difference. Our technicians are away from home and family anyway, so it's just the language that is a bit different. Allen Hall: What brings people to your business? What are they calling about today? I know the yaw ring was the number one item. That's what I remember as being, when you were getting started, the yaw ring with the teeth being broken. Is that still your number one request, or has that changed? Søren Kellenberger: It is definitely often a door opener, because everyone can relate to that. So it brings a lot of interest to the company. And then when we start talking to customers about other wear issues in the turbine, it often turns out that we start to talk about worn sliding surfaces on the yaw ring, or it can be worn out rotor lock holes, or wear and tear to generator shafts or main shafts. There's a whole lot of mechanical things that obviously get worn when you have a turbine running for so many years and hours. And then we just try to see if we can come up with smart ways to fix it uptower instead of deploying cranes and doing large disassemblies. Allen Hall: That's the real problem. I think a lot of operators realize that they have worn assemblies, but they don't really know of any way to address it, so they just live with it, or they try to accommodate as best they can. With the yaw ring teeth, the way I had seen that until I talked to you was they would get a guy with a welder up there and they'd try to weld these teeth back on. But that's really a temporary fix and it's not a long-term answer. You're doing something that is actually better than what the OEM installed to begin with, right? Søren Kellenberger: Yeah. Instead of welding — and I won't say that welding doesn't have its place, because for smaller repairs welding can be a good fix as well. We do also work with welding companies for certain smaller repairs. But imagine you are up in a very confined space, and when you have to start rebuilding a tooth by welding, the more of the tooth that is missing, the more you need. One thing is the welding, but grinding it back to shape again is also a manual process. It's obvious that the more of a tooth that is missing, the more difficult it is to get that actual shape of the tooth afterwards by grinding. So what we do is that we machine away the damaged teeth, and then we bring prefabricated segments that have the actual shape of the original tooth, so that we get very good contact between the yaw gear and the yaw ring after the repair. And I think that is probably the main reason why welding is sometimes not lasting as long as when you have to rebuild a full tooth and then manually grind it. It's very difficult to get that well-defined contact surface. So you get some peak points where you have higher loads, and that will just fatigue those repairs over time, where we have better chances of getting that very good fix. We get very accurate machining because we use CNC-controlled machining, so our repair is within a few hundredths of a millimeter. Allen Hall: Yeah, absolutely. Well, the other approach besides welding and your approach — and this is what I have seen more recently — is the whole nacelle comes off. So the rotor pops off, they lift the nacelle off with a crane, so they have to have a crane on site, and that's really expensive. And they set the nacelle down, and then they have to go in and physically remove the yaw ring, or these sections of it, and replace it. That is extremely expensive and time-consuming compared to what you're describing. What is the delta in cost, roughly? Søren Kellenberger: That is very difficult to say, because it depends how fast you can actually get a crane out. And I guess there is also, in the US, a huge spread on what the deployment cost is for a crane, how close you are to a local crane center, and what the deployment cost is. Then it also depends on your access roads. If the turbine has been out there for 5 or 10 years, maybe your access roads are unfit for the crane anymore. Your hard stand or the crane pad is not in sufficiently good condition to support your crane. So there can be a lot of extra costs that are adding up — not just the rental of the crane, but the overall cost of preparing it and the whole project management of getting that set up. Then you need your support fixtures to place on the nacelle. You need to get your plates down. So it's a lot of logistics, and just preparing the turbine for disassembly is probably about a week. And then you have all the craning and replacing and putting it back together. So if you say you could have everything ready, your turbine is down for, I would guess, two to three weeks. But in reality, the downtime before you can get a crane out there is much, much longer. And we can basically — we have repairs, spare parts, we have them in stock, so we can basically move out the day after we get the call and get your turbine up and running. Installing a segment, which repairs up to six teeth, takes about a day for us to do. Then we need a day to get up in the turbine and get ready, and a day to get back down. So what takes from several weeks to potentially months before you're up and running again, we can do in just about a week. Allen Hall: In the United States, one of the things I hear a lot of times, particularly dealing with cranes, is that procurement, when they want to buy a fix of some sort, doesn't necessarily consider the cost of the crane, the downtime, all those other factors. Obviously, the engineers on the backside are thinking about that, but when it comes to decisions for your technology, that doesn't always get into the mix. Is that a worldwide problem or an American problem? Because that feels like an American problem. Søren Kellenberger: No, it's not. I think it's a worldwide problem. I think what makes the difference is probably that the turbines are typically a bit older in Europe. So in that way, we are a few years ahead in that life cycle. Procurement and also technical organizations have maybe become a bit more used to including that thinking, where this is still a relatively new issue in the US because your fleet is newer. So I think it will change in the coming years, as it will develop naturally as it has done in Europe. But it's also sometimes the structure of the company — that you have a certain organization that takes care of the main component replacement, and then you have a part of the organization that takes care of day-to-day service. And now you don't need to replace your main component, but the work we do is on the main component, so it sort of falls in between those two areas of responsibility in the company. And that can also sometimes be challenging. Allen Hall: So it's not only that you have to get a crane to do a lot of these repairs that you can now do with CNC Onsite, right, internal to the nacelle — but there's also weather, right? I think the one thing we don't consider a lot of times, or have kind of preconceived notions about, is that the weather's, like, 30% downtime. Yes, if you're working with a crane and you're trying to lift heavy objects, there will be 30% downtime because of weather. But when you're doing the repair in the nacelle, what limitations do you have on weather? Is it a much wider window than a crane would have? Søren Kellenberger: Absolutely. We can work up to much higher wind speeds — basically the same wind speeds that you can do ordinary maintenance work within — because our machine is always mounted on the component that we are machining.... | 33m 24s | ||||||
| 9/15/26 | Ex-Ørsted Employees in Demand, CIP Orders Goldwind Turbines | CIP taps Goldwind for an Australian wind project even as Europe fights Chinese turbines. Plus, Alfanar's $100 million bet on Senvion, and where laid-off Ørsted staff are landing. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript The Uptime Wind Energy podcast, brought to you by StrikeTape — protecting thousands of wind turbines from lightning damage worldwide. Visit StrikeTape.com. And now, your hosts.Allen Hall: Welcome to the Uptime Wind Energy podcast. I’m your host, Allen Hall, and I’m here with Rosemary Barnes and Yolanda Padron. And top of the week is Rosemary’s been out and about looking at wind turbines in Australia, and I would like to hear some of the details about that, Rosemary. What did you see out in the wilderness?Rosemary Barnes: You might have to settle for generalities rather than details.Allen Hall: Okay.Rosemary Barnes: I don’t know what’s going on with Australian wind turbines at the moment, but there have been a lot of problems — a lot of lightning damage and a lot of serial defects. That’s the category I’ve been looking at recently. It’s a wide variety, looking at a lot of Australia-specific, or not even Australia-specific, but just local problems. Certain wind farms are getting the same kind of problem over and over again — some of them I’ve never seen anywhere else before. I check in with people like you and other international friends who do similar kinds of work, and some of these damages are just like — everyone’s like, “Well, what is that? I wouldn’t have even believed that was possible.” So that always keeps it really interesting. The last couple of days I’ve spent crawling around inside some blades, getting covered in fiberglass — very reminiscent of my time in the factory, when I used to just be itchy for weeks or months in a row. My hot tip for that: you’ve got to feel the sensation, but it doesn’t bother you. It’s not itching, it’s just zen — zen out, and you can handle being itchy for days in a row.Allen Hall: It’s sort of the hot sauce analogy. Hot sauce is really not burning you, but it just feels like it is, so if you can think it away, it’s just fine. Similar thing. And you’re headed to Denmark and then to Germany pretty soon, right?Rosemary Barnes: Yeah. I’m so sad that you’re not going to be able to come, because I’ve got some really cool tours lined up and cool meetings.Allen Hall: Me too.Rosemary Barnes: So yeah, I’ll have more to report back. But definitely anybody who’s going to be at Hamburg — if you’re in Denmark and have something you want to show, feel free to get in touch. I don’t know what that might be. I’ve got some plans currently — it’s pretty jam-packed, itinerary so far, but looking forward. I always love going over.Allen Hall: Well, when you’re in Denmark, you should go by Copenhagen Infrastructure Partners, Rosie, because they have an Australian project, and the turbines are coming from China. The Gawarra Bayya site is a 408 megawatt project, and CIP has confirmed to Finnos that Goldwind will supply the machines. That lands smack in the middle of the fight between a lot of countries that would like to use Chinese suppliers and the EU Commission, which is really prohibiting it at the moment.So in a sense, we have CIP — a Danish company that’s been pretty much avoiding any sort of Chinese wind turbines in the EU — but once they come out of the EU, they’re perfectly comfortable using Chinese wind turbines in Australia. It does seem like a real contradiction there. And my first thought was, well, Scotland has raised their hand and said, “What the heck — why is it okay for this Danish company to buy Chinese wind turbines and put them in Australia if they’re so afraid of all the technology that’s inside them, and maybe the spying or whatever else the concern is?” Is this going to play out okay, do you think, Rosemary? And especially Yolanda — you’ve worked for a Danish operator. This doesn’t feel right.Rosemary Barnes: I do personally see the contradiction, because Europe is worried about China taking over Europe’s electricity grid. They don’t care what happens to Australia’s electricity grid. Australia doesn’t manufacture any of our own wind turbines, so we don’t care that much. We have so many Chinese solar panels and Chinese cars, and China is our biggest trading partner, so I think we have a lot more comfort with China and Chinese technology in Australia than Europe does. If I’m honest, I think the main reason for Europe’s discomfort is probably primarily to protect their own manufacturing industry, and I don’t disagree with that. So, controversial — is that a hot take?Allen Hall: Well, it sort of is, yeah. I mean, obviously there is a Danish wind turbine manufacturer in CIP’s backyard, so to speak, that they could have easily chosen — Vestas — and put Vestas turbines in. And Vestas is the number one turbine maker in Australia in terms of quantities of turbines. It’s the vast majority Vestas. So it would have made a lot of sense to choose Vestas here. Don’t you think that’s going to create a little bit of tension between the Vestas group and the CIP group?Rosemary Barnes: I don’t know. I don’t think so — I mean, they’re not the same company, right? They’re not sister companies or anything like that. There’s no official relationship other than that they come from the same country.Allen Hall: They’re probably next to one another.Rosemary Barnes: I think you either have a local content requirement, or you allow free competition. It’s a bit weird when you’re somewhere in the middle — officially there’s no local content, but in practice nothing else can be bought. I would rather it all just be on the table, and everyone knows where they stand from the very first days of project planning. You don’t want to get halfway through a project and realize that, even though it’s technically allowed, you’ll never get approval for this, or that the laws might change partway through. I think that’s worse than just knowing from the start that you’ve got to choose European. But in terms of the wind industry going better, I think it’s not a bad thing to see a bunch of different solutions to some of these challenges, and it would be nice if we could all learn from each other and improve.Allen Hall: Well, let me ask you a question here, Yolanda — as you used to work for a Danish operator that is considering using Chinese turbines, at least they haven’t eliminated the possibility of it — is this really just a ploy to push down prices from Vestas and Siemens Gamesa?Yolanda Padron: If it is, it wouldn’t be anything new, right? It’s something that a lot of owner-operators, whether they’re Danish or not, have seen if they can maybe get a lower price. But if they have a fairly homogenous fleet in a country, they might get a site from a different OEM just to prove to themselves, and to their OEM of choice, that they’re not the only ones out there. So this could be something that’s happening. I’m really curious — Rosie, I don’t know if you know, but a lot of times the IT department is all the same in a big company that owns a lot of assets in different countries, and sometimes they’ll try to silo it by continent or by country, or they’ll just keep the same thing everywhere. My understanding was that part of the reason some of these operators didn’t want Chinese wind turbines was because of that whole SCADA system, and everything would have to be integrated into their internal IT. Do you know if they’re siloing their Australian part of their IT department, or their Australian back end, for CIP?Rosemary Barnes: I don’t know about that, but from the sites that I’ve worked with, for the most part, the SCADA system is whoever’s operating the wind farm — that’s their thing. And who is operating this wind farm? I would have assumed it would be Goldwind, because that’s always how it works —Allen Hall: Yeah.Rosemary Barnes: — in Australia, at least. So usually it’s a matter of, if the owner wants to get into the SCADA, they get in and grab it and remove it from the system. It’s not like it’s all integrated. Yeah — it is a good point that maybe this is opening a backdoor into Europe somehow. I can see that as a European regulator, I’d be worried about that, and maybe be requiring something of CIP to ensure that that can’t happen.Allen Hall: Our next story takes us to India, where a Saudi group is writing a $100 million check. Back in a moment.As wind energy professionals, staying informed is crucial, and let’s face it, difficult. That’s why the Uptime Podcast recommends PES Wind Magazine. PES Wind offers a diverse range of in-depth articles and expert insights that dive into the most pressing issues facing our energy future. Whether you’re an industry veteran or new to wind, PES Wind has the high-quality content you need. Don’t miss out — visit peswind.com today.Well, Senvion is getting fresh capital, and a lot of it, coming from Saudi Arabia’s Alfanar Group. They’re investing $100 million into Senvion, and obviously Senvion is a huge wind turbine maker in India — Senvion originally started in Germany, and ends up in India. So the first $34 million already went out to Senvion, and the rest follows in the next couple of weeks, so there’ll be a lot of cash floating around at Senvion. Senvion builds about 1.5 gigawatts of turbine capacity a year and has roughly 16 to 17 gigawatts already deployed. The whole effort does seem like a play to expand Senvion internationally, now that India has essentially created a closed marketplace — if you’re going to put turbines into India, the technology must be developed in India, the manufacturing must be in India, the construction companies, everything else, must be India-based.... | 22m 55s | ||||||
| 9/14/26 | Orsted Wins Tax Fight, Vestas Breaks Onshore Height Record | Allen covers Vestas setting the tallest onshore turbine record in Germany, Skyborn's €3B Baltic wind financing close, Orsted's UK tax fight win, and the debate over turbines as national security assets. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Wind Energy News Flash September 14, 2026 Happy Monday, everyone. Wind turbines... are supposed to be a threat to national security. At least... that is what some people say. But the militaries that actually operate near them? They are turning those turbines into weapons of defense. Hold that thought. First... let us go to Germany. In the little town of Winnberg... Vestas just set a record. The tallest onshore wind turbine ever built. An Enventus one-seventy-two... seven-point-two megawatts... sitting on a hub height of one hundred ninety-nine meters. That is taller than a sixty-story building. The tower is a concrete hybrid. A second turbine is planned for next year. Vestas says the height lets the machine reach stronger and steadier winds... which means more energy and more value. Simple idea. Build taller. Capture more. Now stay in Germany... but head north to the Baltic Sea. Skyborn Renewables just closed financing on the Gennaker offshore wind farm. Three billion euros. Nine hundred seventy-six megawatts. Sixty-three turbines. When it is running... Gennaker will produce three-point-eight terawatt-hours a year. Enough to power one million German homes. Sixteen commercial banks and the European Investment Bank put up the money. And Gennaker already has power purchase agreements with Uniper and Amazon. Commercial operations start in twenty twenty-eight. Now... speaking of the European Investment Bank. The EIB just signed a deal with Danske Bank out of Copenhagen. A two hundred fifty million euro guarantee. Here is why that matters. Before a wind turbine maker can build a single machine... it needs a bank guarantee for the buyer. No guarantee... no production. No turbines. No wind farm. This deal lets Danske Bank issue up to five hundred million euros in guarantees to European wind manufacturers. It is the first deal of its kind in the Nordic region under the EU's twenty twenty-three Wind Power Package. The EIB is backing all of this through a six-point-five billion euro wind program... aimed at building thirty-two gigawatts of new capacity. Now cross the English Channel. Ørsted... the Danish offshore wind giant... just won a tax fight. Back in twenty twenty... Danish tax authorities claimed six-point-six billion Danish crowns in taxes... about one billion dollars... on two British wind farms. Walney Extension in the Irish Sea. Hornsea One in the North Sea. Ørsted said those projects were built, owned, and operated by British subsidiaries. They already paid UK tax. An advisory commission under the EU Arbitration Convention just ruled in Ørsted's favor. The projects have genuine purpose in Britain. They are taxable there. Ørsted says the ruling will mean a minor adjustment in Denmark... largely offset by tax reductions in the UK. And Ørsted expects similar cases to be resolved on the same legal principles. Now head across the Atlantic. Danish service company Global Wind Service... GWS for short... just opened a business unit in Canada. GWS has been in the United States since twenty seventeen. They helped build Block Island. Vineyard Wind One. South Fork. Coastal Virginia Offshore Wind. And finally... a quiet deal in Denmark. Polytech... a Danish wind industry supplier... just bought Dansk Gummi Industri. A family-owned company. Founded in nineteen fifteen. Four generations of the same family. Brothers Peter and Christian Thomsen decided it was time to let someone else take the company forward. Dansk Gummi makes transport solutions for moving blades, towers, and nacelles. Polytech now has four hundred sixty employees. CEO Rene Balle says the deal helps Polytech expand beyond wind and into other industries. Now... back to where we started. National security and wind turbines. Defense experts across Europe say the threat is real... but manageable. Yes... spinning blades create false radar returns. But modern phased-array radar can see right through them. The Trump administration itself quietly ordered four hundred thirty-eight million dollars in phased-array radar from Collins Aerospace... a company that markets wind farm radar mitigation as a core feature. And here is the twist. Poland now requires defense sensors on every offshore wind farm. Its first Baltic project sits two hundred kilometers south of Kaliningrad... a Russian military outpost. Sweden's SAAB tested radar on Ørsted's Hornsea One wind farm in twenty twenty-one... and extended surveillance beyond the reach of ground-based systems. The UK ordered eleven of those radar units. Belgium and the Netherlands are doing the same thing. They are not treating wind farms as obstacles. They are turning them into forward surveillance platforms. As one former Danish special forces commander put it... you are changing the battlefield. But it is a change to your advantage if you use it as a tactical lever. Here is the takeaway for the week. The supply chain bottleneck is not turbines or steel. It is guarantees. The EIB-Danske Bank deal tells you where the real friction lives. Manufacturers cannot start work without bank paper. If you are an operator waiting on turbine deliveries... this is the deal that moves your timeline. And if you are still hearing that offshore wind is a security threat... the people who actually defend coastlines are building their radar networks on top of turbines. The threat narrative is not just outdated. It is backwards. And that is the state of the wind industry for the 14th of September 2026. Join us for the Uptime Wind Energy podcast tomorrow. | 6m 51s | ||||||
| 9/10/26 | offshore windair ambulance service+3 | Michael TosiPaul Russo+1 | HeliService USAEngineering with Rosie | — | offshore windair ambulance+3 | Weather Guard Lightning Tech | 36m 53s | ||
| 9/8/26 | wind energyonshore orders+3 | — | StrikeTape Ultra LPS retrofitNordex+4 | — | NordexVestas+4 | Weather Guard Lightning Tech | 29m 27s | ||
| 9/7/26 | wind energyblade production+3 | — | Siemens GamesaGermany+3 | HornseaHull | Siemens GamesaHornsea+5 | Weather Guard Lightning Tech | 5m 43s | ||
| 9/3/26 | drivetrain diagnosticswind energy+3 | Howard Penrose | MotorDocUptime Wind Energy Podcast | — | drivetrainmain bearings+5 | Weather Guard Lightning Tech | 26m 48s | ||
| 9/1/26 | turbine datawind energy+3 | — | StrikeTape Ultra LPS retrofitEnvision+1 | IndiaSoutheast Asia | turbine datawind jobs+3 | Weather Guard Lightning Tech | 31m 16s | ||
| 8/31/26 | wind energyrenewable energy+4 | — | Clearway EnergySuzlon+3 | MaineIndia+6 | wind farmMaine+7 | Weather Guard Lightning Tech | 2m 34s | ||
| 8/27/26 | root cause analysiswind energy+3 | Morten Handberg | Engineering with Rosie | — | RCASCADA+3 | Weather Guard Lightning Tech | 21m 22s | ||
| 8/25/26 | operator meetingsperformance upgrades+3 | — | — | Melbourne | WOMA 2027operator meetings+4 | Weather Guard Lightning Tech | 23m 07s | ||
| 8/20/26 | wind energyUV blade repairs+3 | Bret Tollgaard | Sunrez | — | UV blade repairsSunrez+3 | Weather Guard Lightning Tech | 26m 22s | ||
Showing 29 of 300
Pitch Fit is a Pro feature
See how bookable this show is for guests, which brands already advertise, the per-episode ad value, and the best-fit guest and sponsor profile. The numbers are blurred on the free plan.
How readily this show books outside guests like you.
How proven this show is for host-read sponsorships.
For Guests
ProFor Advertisers
ProUpgrade to Pro to unlock guest cadence, sponsor categories, fit scores, and per-episode ad value for this show.
Chart history for The Uptime Wind Energy Podcast
Peaked at #1 in Ireland, top 10 in 5 of 30 tracked markets, currently #1 in Ireland.
| Market | Genre | Peak | Current | Trend |
|---|---|---|---|---|
| Ireland | — | #1 | #1 | — |
| PT | — | #6 | #6 | — |
| TH | — | #8 | #8 | — |
| Denmark | — | #9 | #9 | — |
| South Korea | — | #10 | #10 | — |
| AT | — | #11 | #11 | — |
| Netherlands | — | #12 | #12 | — |
| Norway | — | #16 | #16 | — |
| India | — | #19 | #19 | — |
| TR | — | #20 | #20 | — |
| Japan | — | #20 | #20 | — |
| TW | — | #21 | #21 | — |
| Germany | — | #25 | #25 | — |
| Sweden | — | #26 | #26 | — |
| PE | — | #27 | #27 | — |
| South Africa | — | #29 | #29 | — |
| Italy | — | #30 | #30 | — |
| CH | — | #30 | #30 | — |
| Australia | — | #31 | #31 | — |
| BE | — | #32 | #32 | — |
Chart Positions
30 placements across 27 markets.
Chart Positions
30 placements across 27 markets.